How long does it take to install roof insulation?

How long will your home or building be “out of action” while the roof is being insulated? Here you can read the average duration per roof type, what affects the timing and how to speed up the process.

Insulation membrane and new tile battens while insulating a pitched roof

Short answer

Insulating the pitched roof of a family home takes on average 1 to 2 working days (8 – 16 hours). Larger homes take 2 to 4 working days. A small flat roof is often insulated in 4 to 12 hours. If the roofing is renewed at the same time or repairs are needed, it takes longer.

When planning roof insulation, a practical question soon comes up: how long will the work take? That depends heavily on the type of roof, accessibility and the chosen insulation method. Still, clear averages can be given, so you can plan realistically.

We carry out insulation projects every day, from compact terraced houses to large commercial roofs. That means we can estimate well how much time each phase takes, from the free roof inspection to completion. Below you will find the average duration in hours, the factors involved and what you can do yourself to speed up the process.

How long does roof insulation take on average?

SituationWorking hoursWorking days
Family home, pitched roof (from the outside)8 – 16 hours1 – 2
Detached, semi-detached or small commercial building16 – 32 hours2 – 4
Small flat roof (e.g. extension)4 – 12 hours½ – 1½
Large flat roof (commercial building)depends on surface areaseveral days

For a pitched roof, these figures apply where the roof is easily accessible, the roofing is in reasonable condition and there are no major surprises in the structure. On larger roofs, the extra time comes not only from the surface area but also from additional work on dormers, chimneys and roof penetrations. The roof remains wind- and watertight throughout.

On a flat roof, installing insulation boards, tapered layers and new roofing simply takes time, especially if drains and rooflights are included. In our planning we always take the weather into account, so that crucial steps do not take place in the rain.

Factors that affect the duration

Insulation boards being laid on a flat roof
On a flat roof, the insulation goes under the new roofing.

The most important factor is the type of roof. On a pitched tiled roof, work is often done section by section, which requires precision. Flat roofs can be worked on at a larger scale. It also matters whether you insulate from the outside (opening up or raising the roof) or from the inside (between the rafters). Insulating from the inside is sometimes quicker, but not always the best choice.

The condition of the existing roof also counts. During the free roof inspection we assess whether the roof boarding, tiles or roofing are still good enough. If there are rotten parts or leaks, or the roofing is outdated, it is wise to repair them straight away. That extends the project, but prevents you from having to open up the roof again in a few years. Also read whether you can combine roof insulation with a roof renovation.

Accessibility and logistics also play a role. Additional factors are:

  • Roof details: dormers, roof windows and chimneys.
  • Safety: the need for scaffolding or fall protection.
  • Weather: rain and strong winds can halt the work.
  • Specific wishes: for example extra sound insulation.

Step by step: from free inspection to completion

  1. Free roof inspection and adviceWhere many companies charge an average of €75 – €150, our inspection is always free. In 30 to 90 minutes we look at the roof, take photos and assess the current insulation value. You receive advice on the best method and a rough indication of time and costs.
  2. Quote, scheduling and preparationYou receive an itemised quote with the insulation materials, the expected hours and working days and any additional work. Once you agree, we schedule the work together, taking into account your diary, holidays and the weather forecast. You receive practical instructions, such as clearing the attic.
  3. Carrying out the workWe put up scaffolding, secure the site and deliver materials. Then, where necessary, we remove the old roofing or tiles, install the insulation and carefully close the roof.
  4. CompletionWe go over the work together. You receive an explanation, an overview of the materials and often photos of the intermediate steps. Any points of attention are dealt with immediately.

Time and costs: what can you expect?

For an average family home with a pitched roof, allow a total of 1 to 3 working days; for larger homes or buildings 2 to 5 working days. Your home remains habitable during that period.

The cost of roof insulation in the Netherlands is generally between €40 and €120 per m², depending on:

  • Type of roof: flat or pitched.
  • Insulation material: glass wool, PIR, PUR, wood fibre and the like.
  • Thickness: a thicker layer insulates better but costs more.
  • Roofing: is it being renewed as well?

For a standard roof of 50 m² you will roughly end up at €2,000 – €6,000, including labour and materials. For larger roofs or extra work this can be higher. Good roof insulation pays for itself through lower energy bills, and subsidies or tax benefits are regularly available. We are happy to inform you about current schemes. You can read more about methods and materials on our roof insulation page.

Practical tips to shorten the insulation time

  • Clear the attic in advance. The better we can reach the roof boarding (when insulating from the inside), the less time is lost moving belongings.
  • Make choices in advance. Ask all your questions about materials, thicknesses and finish during the inspection. The clearer your wishes, the less delay during the work.
  • Plan outside the peak season. In busy periods, such as autumn, waiting times are longer. If you plan in good time, you have more choice of a period with favourable weather.
  • Make room around your home. Create space for scaffolding or an aerial platform and material storage.

Insulating an older home? Then also read what to look out for with roof insulation for older homes. For commercial buildings we have a separate page on insulating the roof of a commercial building.

Free roof inspection and a tailor-made quote

How long roof insulation takes depends on many factors. With good preparation, clear agreements and an experienced partner, the process stays manageable. You know in advance how many hours and working days the job will take and which steps are involved.

As a close-knit family business, we give you a 15-year guarantee with certificate on our work. Request a free roof inspection and receive a no-obligation quote with a concrete schedule for your roof.

Frequently asked questions about how long roof insulation takes

How long does it take to insulate a pitched roof?

For a standard family home, insulating a pitched roof from the outside takes on average 1 to 2 working days, around 8 to 16 working hours. For a larger home this rises to 16 – 32 hours over 2 to 4 working days.

How long does it take to insulate a flat roof?

A small flat roof, such as an extension, is often insulated in 4 to 12 hours. On large buildings it can take several days, especially if the fall, drains and rooflights are included.

Can I stay at home during the insulation work?

Yes, your home generally remains habitable. Most of the work is done outside. When insulating from the inside, there may temporarily be some more disruption in the attic or the top rooms.

Is insulating from the inside quicker?

Sometimes, but it is not always the best choice structurally or in terms of energy. During the free inspection we advise which method suits your roof.

What does roof insulation cost?

Roof insulation in the Netherlands generally costs €40 – €120 per m². For a standard roof of 50 m² you will roughly end up at €2,000 – €6,000 including labour and materials.

How long does the free roof inspection take?

The inspection usually takes 30 to 90 minutes. We look at the roof, take photos and assess the current insulation value.

Mario de Vet van Dakdienst Nederland

Unsure about your roof?

Mario de Vet and the team of Dakdienst Nederland, a close-knit family business, take a look for free. You get a photo report and honest advice: repair where possible, replace where necessary.

Book a free inspectionCall +31 85 303 61 30

Free roof inspection

Have your roof checked for free.

Tell us what is going on and where your home is. We usually call you back the same day to schedule the inspection.

  • Including photo report
  • No call-out fee
  • 24/7 emergency service at no extra cost
  • Up to 15-year guarantee (5 years on repairs)

What is going on with your roof?

  1. 1Problem
  2. 2Address
  3. 3Details
Choose what is going on with your roof

Something else?

Your address
Your details

No obligation. We usually call you back the same day.

Leaking right now? We're on our way.

24/7 emergency service at no extra cost and with no call-out fee.