Short answer
An average house roof is usually replaced within 1 to 4 working days. A flat roof (40–80 m²) is often finished in 1 to 2 days, a pitched tiled roof generally takes 2 to 4 days. Complex roofs with dormers and chimneys can take 4 to 7 working days.
Replacing a roof is not something you do every year. It makes sense that you want to know how long the work will take and what to expect. The duration depends on the type of roof, accessibility, the number of m², the condition of the substructure and the weather. Even so, clear guidelines can be given. In this article you can read step by step what the timeline looks like, which factors play a role and how time and costs are related.
Dakdienst Nederland works nationwide and specialises in both flat and pitched roofs. Thanks to tight planning, clear communication and a fixed approach, we can estimate well in advance how long your roof replacement will take.
Timeline: from first inspection to completion

A roof replacement always starts with a roof inspection with no obligation. An experienced roofer assesses the condition of your roof covering, checks the substructure and looks at details such as insulation, drainage and lead and zinc work. At Dakdienst Nederland this inspection is always free, whereas the market often charges around €75 – €150 for a thorough roof inspection. During that visit we also immediately assess roughly how many days will be needed.
You then receive a clear quote with an indication of both the costs and the duration. We also discuss whether additional work is needed, such as better insulation, new roof boarding or roof windows. Once you agree, we schedule the work. The time between agreement and start varies from a few weeks to several months, depending on the season and how busy it is.
The work itself follows fixed steps:
- Setting up the work siteScaffolding, fall protection and delivery of materials.
- Removing the old roof coveringTiles, battens or bitumen come off and the base is checked.
- Repairing the substructureWhere needed, the roof boarding or structure is repaired or replaced.
- Applying the new roof coveringIncluding details such as the ridge, valley gutters, lead and roof windows.
- Cleaning and completionA final check together with you and a tidy work site.
Which factors determine how long it takes?
The first and biggest factor is the type of roof:
- Flat roof: bitumen is relatively quick to replace. With 40–80 m² this is often done within 1 to 2 days.
- Pitched tiled roof: tiles are removed and relaid one by one. For an average family home, allow 2 to 4 days.
- Complex roofs: many dormers, chimneys or special details simply require more labour time.
The second factor is accessibility. If the roof is easily reached with an aerial platform or scaffolding and there is room for a skip and material storage, we work much more efficiently. In city centres, narrow streets or with a back garden only reachable through the house, putting up scaffolding and removing debris takes more time.
The third factor is the condition of the substructure. Sometimes it only becomes clear after removing the old roof covering that the roof boarding is partly rotten or that beams need reinforcing. If everything is still sound, the work continues as planned. If parts need to be replaced or reinforced, this often adds 0.5 to 2 working days. We always discuss this with you immediately and transparently.
Real-life examples
To give you a more concrete picture, below are three situations we often come across.
| Situation | Work | Duration | Cost indication |
|---|---|---|---|
| Terraced house, flat roof (approx. 50 m²) | removing old bitumen, checking the roof boarding, new insulation and bitumen, finishing roof edges and drainage | 1 – 2 working days | €2,000 – €8,300 |
| End-of-terrace house, tiled roof (approx. 80–100 m²) | removing tiles and battens, repairing roof boarding, new membrane, counter battens and battens, relaying or renewing tiles, ridge and lead work | 2 – 4 working days, sometimes 1 day longer with extra repairs | €4,400 – €20,000 |
| Detached house, complex roof (approx. 150 m²) | complete replacement, lots of detailed work around dormers, gutters and chimneys, possibly extra insulation | 4 – 7 working days with a larger team | €8,300 – €30,000 |
Indicative amounts including materials and labour. The exact price and schedule depend on the type of tile, insulation, the condition of the substructure and the number of details. Totals calculated with €40 – €165 per m² (flat roof, bitumen) and €55 – €200 per m² (tiled roof), rounded and depending on several factors; after the free roof inspection you receive a fixed price.
For larger and complex projects, an accurate survey is essential. That is why every roof replacement with us starts with a thorough, free roof inspection. Would you like to know specifically how long a pitched roof takes? Then also read how long it takes to replace a tiled roof.
Planning, permits and weather
Besides the work itself, permits and planning play a role. A standard roof replacement usually does not require a permit, certainly not if the appearance and height stay the same. However:
- Listed buildings and protected townscapes: a permit may well be required here.
- Solar panels or dormers: additional rules may apply to these.
A permit procedure can take anything from a few weeks to sometimes more than 8 weeks. We are happy to advise whether you need a permit in your situation and how long that takes.
The weather is a factor no roofer can get around. In heavy rain, storms or prolonged frost it is irresponsible or technically impossible to work safely and properly. We keep a close eye on the weather forecast and let you know in good time if anything shifts. In the meantime the roof is always covered watertight.
Finally, your own schedule counts too. Would you like the work done during or outside your holiday, or combined with painting or solar panels? We are happy to plan around you. Do get in touch in good time, as spring and summer fill up quickly.
Costs and duration: what can you expect?
In general: the larger and more complex the roof, the longer the duration and the higher the costs. For an average family home, these ranges roughly apply:
| Roof type | Duration | Costs |
|---|---|---|
| Flat roof (40–80 m²) | approx. 1 – 2 working days | approx. €1,600 – €13,200 |
| Pitched roof with roof tiles (70–120 m²) | approx. 2 – 4 working days | approx. €3,900 – €24,000 |
Indicative amounts. The price depends on the roof covering, insulation, detailing, type of tile and the condition of the substructure. Totals calculated with €40 – €165 per m²* (flat roof, bitumen) and €55 – €200 per m²* (tiled roof), rounded and depending on several factors. * The price depends on several factors, such as the type of tile or roofing, the surface area, accessibility and the condition of the substructure. After the free roof inspection you receive a fixed price.
If you also improve insulation, install roof windows or repair structural faults, this usually adds both costs and days. High-quality materials are sometimes more expensive and labour-intensive, but often last longer and need less maintenance. Read more about the price structure on our page about the costs of a new roof.
Why our planning is clear
Fixed approach
Every roof replacement follows the same steps, so you know in advance what happens when.
Honest communication
If we find unexpected damage, you hear about it immediately, with photos and a clear explanation.
15-year guarantee
After completion you receive a 15-year guarantee on the replacement, with an official certificate.
As a close-knit family business with VCA, AF Erkend, KOMO, Vebidak and Dakmerk craftsmanship, we make sure your roof is safe and watertight again in as few days as possible. Also take a look at our services for roof renovation, tiled roof replacement and flat roof renewal.
Want to know how long your roof will take? Request a free roof inspection
The duration of a roof replacement is no guesswork if you know what to look for. The type of roof, the scope of the work, the condition of the substructure, accessibility, permits and the weather together determine whether your roof is finished in one, three or seven days.
Combine the guidelines in this article with a free roof inspection with photo report at your home. You then get a realistic estimate of both the duration and the total costs, and a tailored quote with a clear schedule. That way you can align your diary, other renovations and your budget.
Frequently asked questions about the duration of a roof replacement
How long does it take to replace an average house roof?
An average house roof is usually fully replaced within 1 to 4 working days. A flat roof is quicker than a pitched tiled roof.
How long does it take to replace a flat roof?
A bitumen flat roof of 40–80 m² is often replaced within 1 to 2 working days, including insulation and finishing of the roof edges.
How many days does it take to replace a tiled roof?
For an average family home with a tiled roof, allow 2 to 4 working days. With many dormers, chimneys or repairs to the roof boarding, it can take longer.
Can I stay at home during the roof replacement?
Yes. The work is mostly done outside and the roof is closed wind- and watertight at the end of each working day. You can, however, expect some dust and noise in the attic.
What happens if it starts raining during the work?
In heavy rain, storms or prolonged frost we do not work, because it is unsafe and harms the quality. The roof is then temporarily covered and we agree a new day with you.
How long do I have to wait before the roof replacement starts?
There are usually a few weeks to several months between agreement and start, depending on the season and how busy it is. Spring and summer fill up quickly, so plan in good time.