How long does replacing roof tiles take?

The honest answer is: it depends. Still, there are clear guidelines. Here you can read how long replacing roof tiles takes on average, what determines the schedule and what you can expect.

Membrane and tile battens on the roof boarding while roof tiles are being replaced

Short answer

For a terraced or end-of-terrace house, replacing roof tiles takes on average 1 to 3 working days, sometimes 1 to 2 days for a simple roof. A semi-detached or detached house usually takes 3 to 5 working days. Very large or complex projects take 1 to 2 weeks or longer. If tile battens and membrane also need replacing, often allow an extra day.

How long does it take to replace roof tiles? It seems a simple question, but the honest answer is: it depends. Still, there are clear guidelines, average lead times and smart choices that determine how quickly your roof is back in top condition. In this article you can read what to expect: the average duration, the factors that determine the schedule, our working method, the costs and the right moment to take action.

Average duration of replacing roof tiles

Type of home or projectAverage duration
Terraced or end-of-terrace house1 – 3 working days (simple roof sometimes 1 to 2 days)
Semi-detached or detached house3 – 5 working days
Villa, farmhouse or commercial building1 – 2 weeks or longer

For most private homes, replacing roof tiles takes 1 to 3 working days. That includes safely erecting the scaffolding, removing the old tiles, checking the substructure (such as tile battens and membrane) and laying the new tiles. With a simple roof without many dormers or penetrations, the job is sometimes done in 1 to 2 days.

For larger homes with more roof surface, allow 3 to 5 working days. It is not just the square metres that count, but also the details: chimneys, roof windows, dormers and complex roof shapes require more cutting, measuring and connection work. We plan carefully, so your roof is “open” for as short a time as possible.

For very large or complex projects we often work in phases, so the building always remains as well protected against the weather as possible. You receive a clear schedule in advance, so you know which parts of the roof will be done when. For a complete roof replacement, also read how long replacing a tiled roof takes.

Which factors determine how long your roofing project takes?

Ladder lift bringing new roof tiles up to the roof
A ladder lift speeds up the delivery and removal of tiles.
  • Roof surface: a roof of 60 – 80 m² is finished faster than a roof of 150 – 250 m².
  • Roof shape: a simple gable roof goes faster than a roof with corners, dormers and bends.
  • Substructure: if rotten tile battens or a worn underlay need replacing, that takes extra time.
  • Weather: in strong winds, heavy rain or storms, work on the roof is sometimes temporarily stopped for safety reasons.
  • Accessibility: a narrow street or a roof at the rear makes delivery, removal and erecting scaffolding more difficult.
  • Rules: permits or agreements within an owners' association (VvE) can affect the start date.

The condition of the substructure in particular is crucial. When the tiles are removed, it may turn out that the tile battens are rotten or that the membrane has seen better days. The good news: you then get a completely renewed roof build-up, so your roof lasts considerably longer. We always discuss such findings with you first, before carrying out extra work. You can read more about this in do tile battens need replacing too?

A weather delay usually shifts the schedule by a day at most. We take these circumstances into account as much as possible and communicate clearly about them.

Our step-by-step plan: from inspection to completion

The first step is always a no-obligation and free roof inspection. An experienced roofer examines the tiles, tile battens, lead and connection work and watertightness, and estimates how much time your project will take. You then receive a quote with an indication of the lead time, the work (tiles only, or also tile battens and membrane), the materials and any options such as extra insulation or roof windows. Once you agree, we plan together, taking into account your schedule, the season and the delivery time of materials.

During the work, it generally goes like this:

  1. Scaffolding and preparationUsually half a day.
  2. Removing old tilesAnd checking the substructure.
  3. Tile battens and membraneReplaced if necessary.
  4. Laying new tilesIncluding finishing the ridges, verges and details.
  5. Final check and clean-upOf the property and surroundings.

Afterwards the roofer goes over the work with you. You hear what has been done and what to look out for in the future.

Time and costs: what can you expect?

Scaffolding with a Dakdienst banner at a home where roof tiles are being replaced
Good preparation keeps the lead time short.

The duration of the job is closely linked to the costs.

Indication of costs for replacing roof tiles
SituationIndication
Completely replacing roof tiles€55 – €200 per m²*
Standard terraced house, totalapproximately €5,000 – €10,000
Including new tile battens and roofing membranemore like €80 – €140 per m²

Indicative amounts, depending on the type of tile (concrete or ceramic), the condition of the substructure and the difficulty of the roof. * The price depends on several factors, such as the type of tile or roofing, the surface area, accessibility and the condition of the substructure. After the free roof inspection you receive a fixed price.

If the substructure is also renewed, the job often takes an extra day. The advantage is that you can then move forward for years with a fully modernised roof, with less maintenance and better protection against moisture. Also bear in mind: a fast but sloppy roofing job can end up costing you more than a careful replacement that takes a day longer. You can find more price examples at costs of replacing roof tiles for a terraced house.

When is the right moment to replace your roof tiles?

An important indicator is age. Concrete roof tiles last on average around 30 to 40 years, ceramic tiles often 40 to 60 years or longer, provided they are properly laid and maintained. If tiles become porous, crumble or regularly shift, full replacement is often wiser than repeated repairs.

  • Recurring damp patches on your ceilings or mould in the attic.
  • Tiles that are loose after every storm.
  • Tiles that are porous or crumbling.

Waiting until the damage is serious leads to higher costs and a longer repair time, because insulation, beams or interior finishing then also need to be repaired. If you are considering replacement, look straight away at extra roof insulation or preparing your roof for solar panels. That may extend the work slightly, but by combining work you save costs and disruption later.

You can read more about the work on our page roof tile replacement. We are a close-knit family business, charge no call-out fee and give a 15-year guarantee with certificate on the replacement.

Frequently asked questions about how long replacing roof tiles takes

How long does replacing roof tiles take for a terraced house?

On average 1 to 3 working days, including scaffolding, removing the old tiles, checking the substructure and laying the new tiles. With a simple roof sometimes 1 to 2 days.

How long does it take for a detached house?

For a semi-detached or detached house usually 3 to 5 working days, depending on the roof surface and details such as chimneys, roof windows and dormers.

Does it take longer if tile battens and membrane are also replaced?

Yes, often allow an extra day. On the other hand, you get a completely renewed roof build-up that lasts longer.

What happens if it rains during the work?

In strong winds, heavy rain or storms, work on the roof is sometimes temporarily stopped for safety reasons. That usually shifts the schedule by a day at most. The roof is left as well protected as possible.

What does replacing roof tiles cost for a terraced house?

On average €55 – €200 per m², for a standard terraced house approximately €5,000 to €10,000. Including new tile battens and roofing membrane, more like €80 to €140 per m².

Can I stay at home during the work?

Yes, you can usually just stay at home. Do take into account noise and the scaffolding around the house. You will be told the start date and working hours in advance.

Mario de Vet van Dakdienst Nederland

Unsure about your roof?

Mario de Vet and the team of Dakdienst Nederland, a close-knit family business, take a look for free. You get a photo report and honest advice: repair where possible, replace where necessary.

Book a free inspectionCall +31 85 303 61 30

Free roof inspection

Have your roof checked for free.

Tell us what is going on and where your home is. We usually call you back the same day to schedule the inspection.

  • Including photo report
  • No call-out fee
  • 24/7 emergency service at no extra cost
  • Up to 15-year guarantee (5 years on repairs)

What is going on with your roof?

  1. 1Problem
  2. 2Address
  3. 3Details
Choose what is going on with your roof

Something else?

Your address
Your details

No obligation. We usually call you back the same day.

Leaking right now? We're on our way.

24/7 emergency service at no extra cost and with no call-out fee.